Drag
TSX-V:QTWO OTCQB:QUEXF FSE:458

Contact info

Location
Suite 904 – 409 Granville Street
Vancouver, BC V6C 1T2

Follow Us

Disclaimer

MRE Disclaimer

  • Mineral Resources were prepared in accordance with National Instrument 43-101 – Standards for Disclosure of Mineral Projects (“NI 43-101”) and the CIM Definition Standards (2014). Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. This estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, economic, or other relevant issues.
  • The independent Qualified Person (“QP”), as defined by NI 43‑101 for this estimate is Todd McCracken, P.Geo., Director – Mining & Geology – Central Canada, BBA. The Effective Date of the estimate is April 20, 2026
  • Estimation was completed using a combination of inverse distance squared (ID2) and ordinary kriging (OK) in Leapfrog Edge software with dynamic anisotropy search ellipse on specific domains.
  • Drill hole composites at 1 m in length. Block size is 10 m x 10 m x 5 m with sub-blocking.
  • Both underground and open-pit conceptual mining shapes were applied as constraints to demonstrate reasonable prospects for eventual economic extraction. Cut-off grades for open-pit constrained resources are 0.40% Li2O, and for underground constrained resources is 0.70% Li2O. Open-pit and underground Mineral Resource constraints are based on a spodumene concentrate price of US$1,500/tonne (6% basis FOB Bécancour) and an exchange rate of 0.70 USD/CAD.
  • The cut-off grades are based on Li2O (%) only.
  • Rounding may result in apparent summation differences between tonnes, grade, and contained metal content.
  • Tonnage and grade measurements are in metric units.
  • Conversion factors used: Li2O = Li x 2.153; Li2O to LCE x 2.473.
  • Pegmatite and non-pegmatite blocks were assigned a fixed SG based on the field measurement median value of their respective lithology.